Lay Out Building Lines

  • 1.1

    Demonstrate the use and care of precision measuring instruments.

  • 1.2

    Establish building lines.

  • 1.3

    Use a builder's level or transit and differential leveling procedures to determine site and building elevations.

  • 1.4

    Record site layout data and information in field notes using accepted practices.

Perform Concrete/Masonry Work

  • 2.1

    Prepare and pour a footing.

  • 2.2

    Construct a foundation wall or pier.

  • 2.3

    Lay brick/block to specification.

  • 2.4

    Cut brick and block accurately.

  • 2.5

    Demonstrate the process of depositing, spreading, consolidating, and striking off concrete in a form.

  • 2.6

    Construct concrete formwork.

  • 2.7

    Estimate the material needed for concrete/masonry work.

Lay Out and Install Floor Systems

  • 3.1

    Install sill plate(s).

  • 3.2

    Set posts.

  • 3.3

    Construct or place girders/beams.

  • 3.4

    Match selected fasteners used in floor framing to their correct uses.

  • 3.5

    Estimate the amount of material needed to frame a floor assembly.

  • 3.6

    Lay out and construct floor assembly.

  • 3.7

    Install joists for a cantilever floor.

  • 3.8

    Install a subfloor using butt-joint plywood/OSB panels.

Demonstrate Wall and Ceiling Framing

  • 4.1

    Lay out wall lines including plates, corner posts, door and window openings, partition Ts, bracing and plan for installation of fire stops.

  • 4.2

    Assemble wood stud walls.

  • 4.3

    Assemble metal stud walls.

  • 4.4

    Lay out, assemble, erect, and brace exterior walls for a frame building.

  • 4.5

    Cut and install ceiling joists on a wood frame building.

  • 4.6

    Estimate the materials required to frame walls and ceilings.

Frame and Finish a Roof

  • 5.1

    Construct conventional roof and/or set truss systems.

  • 5.2

    Install roof sheathing and coverings.

  • 5.3

    Frame a roof opening.

  • 5.4

    Demonstrate the techniques for installing a variety of types of roofing materials.

  • 5.5

    Estimate the materials used in framing and sheathing a roof.

Identify Thermal and Moisture Protection

  • 6.1

    Install insulation material.

  • 6.2

    Install vapor barrier.

  • 6.3

    Identify types and use of thermal insulation.

Apply Exterior Finishes

  • 7.1

    Identify and/or install frieze boards or soffit.

  • 7.2

    Install exterior moldings and trim.

  • 7.3

    Install various types of siding.

  • 7.4

    Apply correct installation to eliminate water intrusion.

  • 7.5

    Install exterior stucco finish.

Install Doors and Windows

  • 8.1

    Install door systems.

  • 8.2

    Install door hardware.

  • 8.3

    Install window systems.

Install Interior Trim and Stairs

  • 9.1

    Install baseboards and casings.

  • 9.2

    Lay out and cut stringers.

  • 9.3

    Determine the number and sizes of risers and treads required for a stairway.

  • 9.4

    Build a small stair unit.

  • 9.5

    Lay out a skirt board.

Assemble Piping, Waste and Vent Distribution Systems

  • 10.1

    Assemble a soil, waste and vent system.

  • 10.2

    Assemble a water distribution system.

  • 10.3

    Install plumbing fixtures or equipment.

  • 10.4

    Demonstrate the ability to properly measure, cut, and join plastic and copper piping

  • 10.5

    Identify the major components of a drainage system; describe their functions and how they malfunction.

Install Electrical Component/System(s)

  • 11.1

    Identify electrical service entrance requirements.

  • 11.2

    Rough in switch boxes and outlet boxes.

  • 11.3

    Rough in feeder and circuit.

  • 11.4

    Install low voltage systems.

  • 11.5

    Trim out electrical devices and appliances.

  • 11.6

    Install lighting fixture(s) and ceiling fans.

Install Interior Wall and Ceiling Finish

  • 12.1

    Identify type and use of drywall.

  • 12.2

    Demonstrate the proper techniques for cutting drywall.

  • 12.3

    Fasten drywall to ceiling and walls.

  • 12.4

    Apply mud, use tape appropriately and install corner bead.

  • 12.5

    Demonstrate technique for paint application.

Frequently asked questions

What grade levels do these standards cover?
VOCATIONALTRAINING
When were these standards adopted?
2007
Where can I read the official document?
CTE

Keep exploring

Sibling grade bands, other subjects in this jurisdiction, and the same subject across other states.

More Arizona CTE sets

CTE