Skip to main content

Construction: Heating and Humidification 460820 (2026–2027)

Other Kentucky CTE sets

HVAC (Heating, Ventilation, and Air Conditioning) Principles, Terminology, and Safety:1

  • a

    Define basic terminology used in the HVAC (Heating, Ventilation, and Air Conditioning) industry.1.a

  • b

    Discuss the relationship between heat, humidity, and human comfort.1.b

  • c

    Describe the various types of tools and equipment used in HVAC (Heating, Ventilation, and Air Conditioning) and their proper use.1.c

  • d

    Follow approved safety procedures.1.d

HVAC (Heating, Ventilation, and Air Conditioning) Installation Requirements:2

  • a

    Explain the relationship between mechanical codes and proper installation of HVAC (Heating, Ventilation, and Air Conditioning) equipment.2.a

  • b

    Discuss installation requirements for duct systems, piping, and condensate disposal.2.b

  • c

    Discuss techniques on the proper use of code books and reference manuals.2.c

Gas Piping, Venting, Combustion Air:3

  • a

    Explain the importance of the codes as they pertain to gas pipe safety.3.a

  • b

    Explain how the codes affect the installation of piping and gas fired equipment.3.b

  • c

    Identify the codes and standards applicable to proper venting techniques.3.c

  • d

    Identify the life safety hazards of improper venting.3.d

  • e

    Discuss and identify the codes related to determining proper combustion air.3.e

Duct, Ventilation:4

  • a

    Discuss the installation and safety considerations for the proper layout and construction of ducts and fittings.4.a

  • b

    Evaluate air distribution systems to determine proper airflow and duct leakage.4.b

  • c

    Analyze and explain the importance of balancing a whole building's ventilation system.4.c

  • d

    Demonstrate knowledge of codes that relate to the installation of duct and ventilation systems.4.d

Heating and Humidification Safety:5

  • a

    Practice/observe safety procedures and techniques.5.a

  • b

    Perform safety lockout procedures for burners.5.b

  • c

    Test a fan/limit control to identify a set point of control.5.c

  • d

    Test all safety controls.5.d

  • e

    Check ignition systems while following all safety principles.5.e

  • f

    Use tools and test equipment appropriately while following safety practices.5.f

Values:6

  • a

    Check the coil resistance of a valve coil.6.a

  • b

    Test gas valve operation.6.b

  • c

    Check the voltage at the gas valve operator.6.c

  • d

    Check pressure at the inlet vs. the outlet of the gas valve.6.d

  • e

    Explain the operation of a solenoid valve.6.e

  • f

    Identify limited, non-adjustable and adjustable regulators.6.f

  • g

    Determine the application of gas valves.6.g

  • h

    Check the water-regulating valve operator.6.h

  • i

    Discuss TXV valves and their operation.6.i

Pilot Devices:7

  • a

    Differentiate between pilot proving devices.7.a

  • b

    Explain the operation of the flame rod, mercury flame switch, bimetal, and millivolt flame sensors.7.b

  • c

    Test and change a thermocouple flame sensor.7.c

  • d

    Clean the pilot assembly.7.d

Thermostats:8

  • a

    Identify and install residential heating and cooling thermostats.8.a

  • b

    Check and adjust the heat anticipator.8.b

  • c

    Set aqua stat.8.c

  • d

    Identify and design the difference between Communications and Non-Communications Thermostats.8.d

  • e

    Set a Programmable Thermostat.8.e

Furnace Gas System:9

  • a

    Perform a regular conversion on a gas valve from natural gas to LP or reverse low, line voltage, redundant, two-stage, and modulating.9.a

  • b

    Test and adjust the fuel system of the furnace.9.b

  • c

    Measure gas pressure with a manometer.9.c

  • d

    Adjust the burner system to the recommended efficiency.9.d

  • e

    Perform pressure checks on the venting system.9.e

  • f

    Adjust the regulator.9.f

  • g

    Determine air velocity within a duct via Pilot tube/magnehelic.9.g

  • h

    Determine air velocity at grills and diffusers via vane style anemometer, hot wire anemometer, pilot tube, and digital anemometer.9.h

  • i

    Measure temperature difference across heating and cooling equipment.9.i

  • j

    Verify equipment air flow and distribution requirements.9.j

  • k

    Check the operation of gas train components and measurements.9.k

  • l

    Check for correct heating input and adjust to manufacturers’ specifications.9.l

  • m

    Demonstrate an understanding of combustion theory.9.m

  • n

    Determine combustion air requirements.9.n

  • o

    Verify system operation.9.o

Heating:10

  • a

    Test spark ignition modules.10.a

  • b

    Wire a complete heating system – line and low voltage.10.b

  • c

    Identify controls for heating and cooling.10.c

  • d

    Check the ignition system.10.d

  • e

    De-rate or change over a gas burner.10.e

  • f

    Check for proper temperature rise across the furnace.10.f

  • g

    Set proper air distribution in-house.10.g

  • h

    Remove, install, and adjust the blower motor and/or belt.10.h

  • i

    Adjust individual register outlets to properly balance the system.10.i

  • j

    Demonstrate good customer relations in a classroom simulation.10.j

  • k

    Explain the importance of manufacturers’ installation and operation requirements.10.k

  • l

    Determine equipment electrical requirements.10.l

  • m

    Check the operation of all electrical control components.10.m

  • n

    Demonstrate the use of tools and instruments.10.n

  • o

    Test for proper combustion.10.o

  • p

    Check electrical components for operation and wiring connections.10.p

  • q

    Read electrical wiring diagrams and demonstrate an understanding of wiring diagrams.10.q

  • r

    Develop a systematic way to diagnose system problems and demonstrate them in class.10.r

  • s

    Determine the cause of failure in a heating system.10.s

  • t

    Identify and describe all possible causes of failure and how to eliminate causes.10.t

  • u

    Write a service report.10.u

  • v

    Demonstrate good customer relations.10.v

Cooling and Heat Pump (Super-heat and Sub-Cooling):11

  • a

    Determine what type of Freon is in the system.11.a

  • b

    Hook up the refrigeration manifold to the system.11.b

  • c

    Start the system and allow it to settle reading on gauges.11.c

  • d

    Install line temperature measurement probes.11.d

  • e

    Read gauge pressure and saturation temperature.11.e

  • f

    Read the line temperature from the thermometer on the high and low sides.11.f

  • g

    Determine superheat (suction) and sub-cooling liquid.11.g

  • h

    Demonstrate proper shutdown.11.h

  • i

    Remove testing equipment properly.11.i

  • j

    Restart the equipment and put it in normal operation.11.j

Humidification:12

  • a

    Wire a humidistat into an electrical circuit.12.a

  • b

    Determine the relative humidity using a sling psychrometer.12.b

Fuel Oil:13

  • a

    Measure the resistance of a cad cell during operation.13.a

  • b

    Check safety control for proper timed operation on shut down.13.b

  • c

    Check oil burner components and measurements.13.c

  • d

    Evaluate fuel supply systems.13.d

  • e

    Change the fuel oil filter.13.e

  • f

    Clean oil pump strainer.13.f

  • g

    Measure the chimney draft with a draft gauge.13.g

  • h

    Determine the efficiency of an oil pump using a vacuum gauge and a pressure gauge.13.h

  • i

    Check for proper oil pressure at the fuel pump.13.i

  • j

    Remove drawer assembly, change nozzle, and adjust ignitors.13.j

  • k

    Change oil pump coupler.13.k

  • l

    Install delay fuel oil valve.13.l

  • m

    Perform an efficiency test on an oil-gas burner: smoke test, CO2 test, and O2 test.13.m

  • n

    Set over the fire draft.13.n

  • o

    Set breech draft.13.o

Boilers:14

  • a

    Oil motors and bearings.14.a

  • b

    Check the circulator for alignment and lubrication.14.b

  • c

    Check the system for any gasket leaks at tankless and circulators.14.c

  • d

    Remove air from the water system.14.d

  • e

    Inspect/change zone valve operator.14.e

  • f

    Wire a multizone/multi-pump hydronic system.14.f

  • g

    Identify types of hydronic piping systems.14.g

  • h

    Observe proper draft conditions.14.h

  • i

    Test boiler efficiency and clean if necessary.14.i

  • j

    Set aqua stat.14.j

Codes:15

  • a

    Describe the reasons for codes.15.a

  • b

    Discuss three model codes: Boca, standard, and uniform.15.b

  • c

    Identify the codes and standards for the applicable area, locality, or state.15.c

  • d

    Discuss the relationship between codes and manufacturers’ installation instructions.15.d

  • e

    Identify standards not covered by codes: AHRI (Air Conditioning, Heating, Refrigeration Institute), ASHRAE (American Society of Heating, Refrigeration, and Air Conditioning Engineers), and SMACNA (Sheet Metal and Air Conditioning Contractors National Association).15.e

  • f

    Explain the importance of local licensing codes.15.f

  • g

    Explain how the codes affect the installation and operation of HVAC (Heating, Ventilation, and Air Conditioning) equipment.15.g

  • h

    Explain the relationship between manufacturers’ suggested installation procedures and codes.15.h

  • i

    Explain the importance of codes as they pertain to safety.15.i

  • j

    Compare commercial codes and codes that pertain to residential applications.15.j

  • k

    Demonstrate knowledge of codes that relate to the installation of HVAC (Heating, Ventilation, and Air Conditioning) equipment.15.k

Frequently asked questions

What grade levels do these standards cover?
Grade 10, Grade 11, and Grade 12
Where can I read the official document?
2026–2027 Construction Education Courses

Find this useful?

If so, you'll love the standards search built into Common Planner.

Keep exploring

Sibling grade bands, other subjects in this jurisdiction, and the same subject across other states.

More Kentucky CTE sets

CTE